BWTS installation from mechanical fit-out to electrical scope, commissioning and class certification.
- Engine room equipment layout study
- Pipework routing and integration with existing ballast network
- Coordination with manufacturer and class society
- Drawing approvals before installation
- BWTS unit placement and support brackets
- Galvanised piping and valves
- Tie-in to ballast pumps and filters
- Pressure and tightness testing
- Power and control cabling
- Starter panels and integration with ship automation
- Commissioning together with the system manufacturer
- Class survey and certification support