Home / Service

Ballast water treatment system installation.

BWTS installation from mechanical fit-out to electrical scope, commissioning and class certification.

  • Engine room equipment layout study
  • Pipework routing and integration with existing ballast network
  • Coordination with manufacturer and class society
  • Drawing approvals before installation
  • BWTS unit placement and support brackets
  • Galvanised piping and valves
  • Tie-in to ballast pumps and filters
  • Pressure and tightness testing
  • Power and control cabling
  • Starter panels and integration with ship automation
  • Commissioning together with the system manufacturer
  • Class survey and certification support