Funnel extension and seven unit scrubber retrofits.

Both vessels received funnel extension, seven scrubber units and full renewal of main engine and generator engine exhaust ducting, prefabricated at the NAVEP factory and installed dockside.

A Blue Star Delos. Ro/Ro Passenger

Funnel extension and installation of scrubber units. Steel works completed in factory and onboard.

  • Funnel extension: height 2,000 mm, breadth 845 mm, port and starboard
  • Funnel extension prefabricated from Grade A steel in factory
  • Removed all original exhaust ducts: 4 main engine pieces, 3 generator engine pieces
  • New main engine exhaust ducts in 6 mm Corten steel plates, A 588 material
  • New exhaust ducts for generator engines and one boiler line
  • Installed 7 exhaust gas scrubber systems for main and generator engines
B Superfast XI. Ro/Ro Passenger

Funnel extension, forward shift and installation of scrubber units. Aluminium prefabrication for the funnel extension.

  • Funnel extension: height 3,000 mm, breadth 700 mm, port and starboard
  • Funnel moved 6 metres forward along the vessel
  • New funnel extension prefabricated using Aluminium Alloy H111 5083
  • Removed all old exhaust ducts: 4 main engine, 3 generator engine pieces
  • New main engine exhaust ducts in 6 mm and 8 mm Corten steel plates, A 588 material
  • New generator engine exhaust ducts
  • Installed 7 scrubber units, factory fabrication and onboard installation